Engineering features
- Project-specific boiler and grate arrangement
- Fuel feeding and ash-handling options
- Coordinated draft and combustion control
- Complete water-treatment and auxiliary package
Steam Boiler
Industrial steam boiler packages for solid-fuel applications, engineered with matching auxiliaries and controls.

System overview
JIELI THERMAL coal-fired steam boiler packages combine the pressure part with fuel feeding, combustion, draft, dust collection, water treatment and controls selected for the project.
Equipment and project gallery
JIELI THERMAL equipment and manufacturing views. Some images are digitally retouched for presentation; these are not unaltered site records. Select an image to read its description.
Technical parameters
The table below is translated from the technical data supplied for this product family. Final selection is confirmed against your fuel, operating conditions and project requirements.
| Technical parameter | Unit | DZL1 | DZL2 | DZL4 | DZL6 | DZL8 | DZL10 | DZL15 | DZL20 | DZL30 |
|---|---|---|---|---|---|---|---|---|---|---|
| Rated evaporation capacity | t/h | 1 | 2 | 4 | 6 | 8 | 10 | 15 | 20 | 30 |
| Rated working pressure | MPa | 0.7 | 0.7 | 0.7 | 1.25 (0.7) | 1.25 (0.7) | 1.25 (0.7) | 1.25 (0.7) | 1.25 (0.7) | 1.6 (1.25) |
| Steam temperature | °C | Saturated | Saturated | Saturated | Saturated | Saturated | Saturated | Saturated | Saturated | Saturated |
| Feedwater temperature | °C | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 |
| Available fuel | — | Bituminous coal and other project-specified coal fuels | ||||||||
| Thermal efficiency | % | ≥83 | ||||||||
| Overall length | mm | 4520 | 5590 | 6620 | 7100 | 7690 | 8500 | 8650 | 9890 | 10400 |
| Overall width | mm | 1720 | 2120 | 2810 | 3100 | 3340 | 3700 | 4200 | 4380 | 5620 |
| Overall height | mm | 3030 | 3160 | 3595 | 4000 | 4200 | 5360 | 5470 | 6900 | 7630 |
Values are translated from the supplied technical parameter sheets and are intended for preliminary selection. Product data may be updated as designs evolve; final performance, dimensions and configuration are subject to the confirmed technical proposal.
Selection starts with data
Tell us the operating temperature or steam pressure, load profile, fuel condition, site arrangement and the process being heated. We will use those inputs to shape the equipment and system proposal.
STEAM SYSTEM SELECTION
Coal steam boiler and coal-fired steam boiler are common buyer terms for industrial steam systems using project-confirmed coal. Boiler pressure parts, combustion, feeding, draft, dust and ash handling, feedwater, controls and emissions equipment must be engineered as one plant.
Confirm normal, peak and minimum steam demand, pressure, temperature, condensate return and operating schedule.
Provide calorific value, moisture, ash, volatile matter, sulfur, particle size and ash-fusion data for the actual fuel.
Local particulate, sulfur and other limits affect the dust-control and flue-gas treatment boundary. Final selection must follow the destination-country requirements.
COAL QUALITY AND COMBUSTION
A generic search for a coal boiler or solid fuel boiler does not define steam capacity, pressure, coal properties or the required environmental equipment. For industrial steam service, the boiler, feeding and grate, furnace, fans, dust and ash systems, water treatment and controls must be specified together.
Provide calorific value, moisture, ash, volatile matter, sulfur, particle size and ash-fusion behavior for the intended supply range.
Confirm normal, peak and minimum demand, pressure, temperature, condensate return, feedwater and operating schedule.
Local particulate, sulfur and other limits determine dust collection, possible flue-gas treatment, fan duty and stack interfaces.
BUYER FAQ
These answers provide a preliminary engineering framework. Final configuration depends on the confirmed fuel, duty, site conditions, local requirements and contracted supply boundary.
Open the manufacturer evaluation checklistProvide representative calorific value, moisture, ash, volatile matter, sulfur, particle size and ash-fusion data, with the expected variation. The combustion and emissions system must be based on the actual fuel.
A different coal may change ignition, heat release, slagging, ash, emissions and capacity. The manufacturer should review the new fuel before operation and confirm any changes to feeding, air distribution or controls.
Build a time-based demand profile and confirm pressure at each process after distribution losses. Check normal, peak and minimum demand rather than selecting only from connected load.
Equipment depends on fuel ash, local particulate and other emissions limits, boiler configuration and site layout. Define dust collection, draft, ash discharge and disposal responsibilities in the project boundary.
Send steam demand profile, pressure and temperature, coal analysis, water and condensate data, site conditions, emissions limits, utilities, layout and required equipment, documents and support scope.
Start a project
Share your fuel, required capacity, operating conditions and project location. Our team will help shape the boiler and the complete system around your actual production requirements.